Wickersham Construction-Penn DOT BPT Keystone Corridor Coatesville Train Station Project – Projected Award Date – 9/17/21

Wickersham Construction & Engineering, Inc.
Penn DOT BPT Keystone Corridor Coatesville Train Station Project –
Projected Award Date – 9/17/21

Project Overview:
THIS IS A PREVAILING WAGE PROJECT.
DBE Participation is required.

All work being done on the Fleetwood St. Realignment & Surface Parking Lot phases must be done by a Prequalified PennDOT subcontractor. 

Project must comply with Buy America regulations

Projected Award Date – 9/17/21
Projected Construction Start on Site – 2/3/22

Penn DOT BPT Keystone Corridor Coatesville Train Station Project will consist of the following:

Selective Demolition, C.I.P. Concrete, Rebar, Form Liner, Precast Structural Concrete, Concrete Topping, Masonry Cleaning, Historic Stone Masonry Repointing, Masonry, Cast Stone, Structural Steel, Cold Formed Metal Framing, Misc. Metals, Decorative Metal Railings, Rough Carpentry, Lumber, Waterproofing, Air Barriers, Standing Seam Metal Roofing, Metal Plate Wall Panels, Joint sealants, Expansion Control, HM Doors & Frames, Access Doors & Frames, Aluminum Storefronts, Fiberglass-Sandwich-Panel Assemblies, Glazing, Fixed Louvers, Metal Panel Ceilings, Painting, Graffiti Resistant Coatings, Panel Signage, Site furnishings, Conveying Equipment, Site work, Excavation Support & Protection, Drilled Concrete Piers & Shafts, Micropiles, Asphalt Paving, Concrete Paving, Pavement Markings, Tactile Warning Surfaces, Chain Link Fences & Gates, Turf & Grasses, Plants, Brick Pavers, Granite Setts, Removable Bollards, Concrete Curb, Traffic Control Signs.

If you are interested in bidding or have additional questions please let me know and I will get you a link to all the documents.

Honman Chau | Chief Estimator |Wickersham Construction & Engineering, Inc. |777 East Ross Street Lancaster, PA  17602 | Office 717-397-8282 X113 | Fax 717-397-5826|